Subject | Author | Likes | Latest Post | Replies | |
---|---|---|---|---|---|
Having a solution where data from ERP systems can be loaded alongside service and installed pro...
| 3 | 2 | |||
Currently, PM schedules are based on intervals that are based on the initial setup of the plan...
| 24 | 9 | |||
In Japan there will be a huge shift towards the use of robots for maintenance & repair work tha...
| 0 | 1 | |||
There should be a way to set different icons on the map for service teams or Resource Type so S...
| 3 | 2 | |||
We often have jobs spanning 4-5 days, or even longer, and easily generate 10-15 entries for Ser...
| 1 | 1 | |||
It would be great to have a ServiceMax Variable which would tell you the platform it was runni...
| 1 | 1 | |||
Hi, There are some cases where an engineer is reporting a WD on a specific WO in mistake. I...
| 3 | 0 | |||
Need a way to know how the user is accessing the platform, on-line or offline. Need this so th...
| 7 | 13 | |||
Ability to either have service price books as a standard (OOTB) feature on Accounts, or have "c...
| 4 | 1 | |||
It's a standard model to have service contracts include rates for regular time, overtime, and e...
| 0 | 1 |